Machine Administration Guide 2.6 |
Contents
Index
![]() ![]() |
Chapter 3 Model Family-Specific Information | > 3.2 PRIMEPOWER250/450 | > 3.2.9 Auto Power Control System (APCS) Administration |
This section describes how to execute the Add Holiday operation.
Schedule operation starts.
After adding holiday schedule entries, verify that the results were correctly reflected.
Show Status of Schedule Entries displays schedules for seven days after the current date and time. To check all schedules, use the apcsset command (-L option).
#/opt/FJSVapcs/sbin/apcsset -L 30 -f <return>
For information on the apcsset command, see Section 4.5, "apcsset (1M)."
Schedule operation starts.
Contents
Index
![]() ![]() |