Machine Administration Guide 2.6
Contents Index PreviousNext

Chapter 2 Machine Administration Functions

2.4 Automatic Power Control Function

This function is supported by all models except PRIMEPOWER1. SMC provides the automatic power control function for the PRIMEPOWER800/1000/2000 model group, the PRIMEPOWER900/1500/2500/HPC2500 model group, and the GP7000F model 1000/2000 group. Accordingly, use SMC for these model groups.

The automatic power control function sets the power on/off schedule of the main unit and automatically controls operation according to the schedule. Machine Administration provides two types of menu for automatic power control: the CUI menu and the GUI menu. The tables below show these two menus.

The automatic power control menus available depend on the main unit model to be monitored.


For a PRIMEPOWER200/400/600 or GP7000F model 200/200R/400/400R/400A/600/600R, see Section 3.1.2, "Main Unit Models and Available Menus."

For a PRIMEPOWER250/450, see Section 3.2.2, "Main Unit Models and Available Menus."

For a PRIMEPOWER650/850/900/1500/2500/HPC2500, see Section 3.3.2, "Main Unit Models and Available Menus."

For a PRIMEPOWER800/1000/2000 or GP7000F model 1000/2000, see Section 3.4.2, "Main Unit Models and Available Menus."

For the automatic power control function of GP7000F model 1000/2000 and PRIMEPOWER800/900/1000/1500/2000/2500/HPC2500, refer to the following manual: "System Console Software User's Guide"

CUI menu

Y : This setting is made at installation of the main unit.

*1: This setting is made as required.

- : No setting to be made.

Menu item/
function name

Outline

Whether or not a setting is made
(Name(s) of person(s) in charge are enclosed in parentheses.).

Start Schedule

Starts schedule operation.

When schedule operation is started, the operating status enters the "Started" state.

-

Stop Schedule

Stops schedule operation.

When schedule operation is stopped, the operating status enters the "Inactive" state.

-

Add Schedule Entry

Sets a daily schedule, weekly schedule, and monthly schedule.

*1
(System administrator)

Add Holiday

Sets a holiday schedule.

*1
(System administrator)

Select and Delete Schedule Entries

Deletes an optional schedule.

-

Delete all

Delete all schedules.

-

List Schedule Entries

Lists all schedules (holiday schedule, specific day schedule, daily schedule, weekly schedule, and monthly schedule).

-

Show Status of Schedule Entries

Displays the planned execution of automatic power control after the current time.

-

GUI menu

Y : This setting is made at installation of the main unit.

*1: This setting is made as required.

- : No setting to be made.

Menu item/
function name

Outline

Whether or not a setting is made
(Name(s) of person(s) in charge are enclosed in parentheses.).

Automatic Power Control/Display Related to Automatic Power Control

Displays all schedules.

The following information is displayed.

  • Operating Status
    Displays the operating status of the schedule.
    Started: Schedule operation has been started.
    Inactive: Schedule operation has been stopped.
  • Automatic Power Control Schedule
    Displays a schedule 30 days ahead.
  • Power Recovery Entry Mode
    Displays settings such as whether power is to be recovered.

-

Automatic Power Control/Schedule Setting

Sets the start and stop of schedule operation.

Also sets a daily schedule, weekly schedule, and monthly schedule, etc.

The following setting items are used.

  • Day-of-the week setting
  • Every day setting
  • Specify-day setting
  • Holiday setting
  • Start time
  • Stop time
  • Shutdown mode

Y
(System administrator)

Automatic Power Control/Schedule Deletion

Deletes any schedule.

-

Automatic Power Control/Power Recovery Mode Setting

Sets power recovery entry mode.

If the power supply is turned off for such reasons as a power failure when the main unit is in operation, sets power recovery operation to power-recovery entry mode.

Y
(System administrator)

Automatic Power Control/Cluster System Matching

Matches the cluster system schedule with the automatic power control schedule.

If an additional cluster system configuration host is installed or a host is swapped, this matching operation is performed as well.

*1
(System administrator)


Contents Index PreviousNext

All Rights Reserved, Copyright(C) FUJITSU LIMITED 2001-2005
All Rights Reserved, Copyright (C) PFU LIMITED 2001-2005