Dynamic Reconfiguration User's Guide 2.5.1
Contents PreviousNext

Chapter 2 DR Environment and Administration> 2.3 DR Configuration and Administration Issues> 2.3.3 DR Administration Issues

2.3.3.2 Realtime Process Administration

During DR attach/detach operation, realtime processes are not scheduled in a few seconds. DR operation query the operator whether this few seconds doesn't meet the requirement of the realtime process or not (See "6.1.3.3 Inquiring Message" and "7.1.3.3 Inquiring Messages"). There are several ways to handle realtime processes against DR attach/detach operation.


Contents PreviousNext

All Rights Reserved, Copyright (C) FUJITSU LIMITED 2005